Korea Construction of 2-3 of the southern breakwater of Ulsan New Port / DCM Construction

Summary

It is a construction to secure a constant-temperature water area necessary for smooth operation of the Ulsan New Port South Port Pier 2 and Northeast Asia Oil Hub 2, and the largest DCM diameter and first/maximum construction cross-sectional area in Korea (7.281m2).

  • Begin 2022.01

    Client Ministry of Oceans and Fisheries

  • Location Ulsan, Republic of Korea

    Explanation Off-Shore DCM Improvement: 2,046,004㎥ (D1600mm*4drivers)

Youtube
CS CENTER